Slab down first wall underway

The slab was poured on Monday and looks great – though there isn’t too much to see. Because it is the waffle type it sits quite high out of the ground however they have already put some soil around the edges to build it up and some gravel in the front for construction traffic to come.

The first wall has also started today. The block wall which is on the edge of the garage on the boundary line. This will be the only wall of this type though.