Infrastructure In

It has been a little while since posting and from the outside it may not look like much has happened but all of the electrical, plumbing and air conditioning has been completed. There is now cabling and ducting running everywhere. Most of the Windows have been installed but some are still being finalised.

We have had to fine tune a few of the cable installs but I have the TV antenna installed, foxtel cabling to both TV locations and the data hub. Luckily we have been able to get some cabling installed for future security cameras and security system which  is great.